Version 1.1.0
26 September 2022
Copyright
Copyright © 2021 – 2022 Philippine Green Building Council.
The Advancing Net Zero Philippines (ANZ/PH) Program was established and administered by the Philippine Green Building Council (PHILGBC). The Advancing Net Zero Philippines Certification is the product of the ANZ/PH Program. The Advancing Net Zero Rating Schemes and User Guide are documents developed under the system.
This User Guide is available online for use by project teams, building owners, professionals, contractors, and other interested parties as a reference voluntary standard for the measurement of the performance of projects.
You may make copies of any information reasonably incidental to your viewing of the document, and may retain a copy for your personal reference. You are not allowed to sell, modify, reproduce, display or distribute the User Guide for any public or commercial purposes, except with the expressed written permission from the PHILGBC. You are not allowed to transmit, distribute or store a copy of this document in any other website or in a networked environment.
This document is protected by Republic Act No. 8293: Intellectual Property Code of the Philippines and international copyright laws. Any unlawful use of this document shall be subject to sanction and legal action of the PHILGBC.
The PHILGBC accepts no responsibility for any unauthorized use or distribution by others of this document and may take legal action to prevent such unauthorized use or distribution.
Published by the Philippine Green Building Council
Unit G-4B, One/NEO, 26th Street corner 3rd Avenue
Bonifacio Global City
Taguig City 1634 Philippines
+632 7728 0686
ANZPH@philgbc.org
The latest release of this User Guide may be accessed through http://docs.anzph.org/userguide/latest.
Navigating the User Guide
This User Guide is a guidance document to support the implementation of the ANZ/PH.
Who should use this User Guide?
This User Guide is developed for project owners, developers, architects, engineers, designers, and other members of the project teams of registered projects.
How do you use the User Guide?
The information in this User Guide is presented in a clear and easily understandable manner using plain language. You may navigate through the guide by:
- Scrolling the page;
- Using the Navigation Panel; or
- Using the search box at the top-right corner of the page.
Navigation Panel
If you are viewing the User Guide on your laptop or computer, use the Navigation Panel
at the left side of this website. The Navigation Panel
includes all major sections of the User Guide.
As you scroll through the page, the panel displays your current location in the User Guide. You can also select any of the section headings on the panel to jump to that section.
If you are viewing the User Guide on your mobile phone or tablet, select Menu
at the top-left corner of the User Guide to view the Navigation Panel
.
Search Box
The Search Box
is located above the Navigation Panel
that allows you to swiftly search through the whole User Guide.
Type keywords related to the information you are searching for. All sections with your keywords will be displayed below the search bar for easier navigation through the guide.
Printing the User Guide
The User Guide is distributed online to promote the use of less paper. However, you may print the User Guide if you need a copy of the document. Printing the User Guide will result in the type-formatted version of the guide. Please be mindful that the guide is updated from time to time. Visit the online User Guide regularly to ensure you have the latest version of the document.
- Open the User Guide in your preferred browser.
- Print the User Guide.
- For Windows,
Control + P
, or - For macOS,
Command + P
.
- For Windows,
Guidance Notes
Guidance Notes
are included to provide additional information and assist you in implementing ANZ/PH in your project.
Requirement levels
The requirements under the Advancing Net Zero Rating Schemes and in the User Guides use the following auxiliary verbs to ensure clarity and consistency in writing and interpreting the requirements:
Provisions using: | refers to: |
---|---|
Must | absolute requirements. Must and shall are equivalent in the use of these documents. |
Must not | absolute prohibitions. Must not and shall not are equivalent in the use of these documents. |
Should | highly recommended provisions. Highly recommended provisions were identified as the most appropriate requirements for a credit. If you will not be implementing these provisions, you must have a clear explanation why it is not applicable for your project, and a reasonable alternative to address these requirements. |
Should not | discouraged provisions. These provisions are not recommended, however, it may be acceptable or valid within certain conditions. You must ensure that you have understood the full implication of these provisions before implementing these requirements. |
May | optional provisions or information. |
About ANZ/PH
Advancing Net Zero Philippines (ANZ/PH) is a program of the Philippine Green Building Council (PHILGBC) to transform the design, construction and operations of projects towards the net zero goal.
ANZ/PH aims to transform the built environment by reducing resource consumption and emissions, and shifting towards more sustainable sources to keep projects' impacts at neutral or even provide positive benefits.
ANZ/PH is aligned with the global campaign of the World Green Building Council (WorldGBC) to accelerate the uptake of net zero carbon buildings to 100% by 2050.
As part of program, rating schemes, tools and documents are being developed to support the development and implementation of net zero projects, including the certification of net zero projects.
How can you contribute to ANZ/PH?
Provide your comments
We welcome your comments and insight on the ANZ/PH Program. Provide your comments by submitting your recommendations through the following procedures, including:
- Access the Form – Comment.
- Provide your full name, position or designation, and the organization you are representing;
- Clearly state your issue a specific section or credit:
- State the specific section or credit you would like to improve;
- Provide a clear statement summarizing your issue; and
- Provide a brief discussion on the issue;
- Clearly state your recommendation to improve the section or credit;
- Provide the draft text for the revision of the section or credit;
- Use plain language principles; and
- Provide a brief discussion on the recommendation;
- Submit your issue and recommendation.
Your comments will be received and logged by the ANZ/PH Program Secretariat.
Host our meetings
You can become a sponsor of the development of the tools under the ANZ/PH by providing support for meetings, workshops, and conferences. You can support the development activities by sponsoring meetings, workshops or campaign activities for the program.
Share your data and case studies
You can support the research and development of ANZ/PH by sharing your data and case studies on your projects. One of the challenges in the development of ANZ/PH is in identifying baselines and performance targets for resource consumption, and ensuring the tool is in line with current best practices in the industry.
We understand that there may be limitations when you share your proprietary information to the PHILGBC. This is why we commit to the proper handling, use, and storage of confidential information you share with the PHILGBC.
Certification
What is Advancing Net Zero Philippines Certification?
Advancing Net Zero Philippines Certification is the formal assessment, rating, and certification process for projects of the ANZ/PH Program. It is conducted in a third-party assessment process to ensure a credible, independent, impartial, and objective assessment, rating, and certification of projects under the ANZ/PH.
Only projects that complete the formal process, complies with all requirements, and receives at least the minimum rating for certification may claim as an Advancing Net Zero certified project.
Who will certify your project?
The PHILGBC will certify the project based on the outcomes from the assessments during the Net Zero Certification process.
The PHILGBC or its authorized assessment body will facilitate and conduct the assessment, rating, and certification process. The PHILGBC builds trust and confidence in the system by managing and addressing conflicts of interests between the project, the project team, and the assessment team assigned for the project.
How can you get you project certified?
To get certified as an Advancing Net Zero project under the ANZ/PH Program, you must:
- Register your project.
- Successfully complete the assessment and certification process using an Advancing Net Zero Rating Scheme.
The project must complete the Advancing Net Zero Philippines Certification process, comply with all minimum system requirements, and achieve the minimum rating for certification.
Addenda
26 September 2022, v1.1.0 Added information on the use of active rating schemes.
How do you register for Advancing Net Zero Philippines Certification?
The project owner must review the eligibility of the project for the applicable Net Zero Rating Scheme, and compliance with the Minimum System Requirements.
To register a project for Advancing Net Zero Philippines Certification, the project owner must:
- Access the Form – ANZ/PH Registration;
- Accomplish the Form – ANZ/PH Registration and prepare the documents for the minimum system requirements; and
- Submit the requirements through e-mail to ANZPH@philgbc.org.
The PHILGBC will prepare and submit a Advancing Net Zero Philippines Certification Proposal within seven (7) working days from the receipt of your complete requirements.
Once the project owner receives the proposal, the project owner must:
- Sign the proposal and return a copy to the PHILGBC; and
- Pay the registration fee and initial assessment fee.
The Registration process is completed once the project owner accepted and signed the proposal, and paid the registration fee and downpayment for your project.
Management Representative
The project owner must assign a Management Representative (MR), who will serve as the official representative of the project owner. The MR must:
- Be employed by the project owner and part of the senior management;
- Coordinate and communicate with the certification manager for the process; and
- Provide timely decision making for the efficient implementation of the process.
Scope and Applicability
The Scope and Applicability defines the life cycle stages and project types that the rating scheme is applicable to.
For projects that are interested in undergoing certification that are not included in the Scope and Applicability, please contact the ANZ/PH Program Secretariat at ANZPH@philgbc.org to confirm whether the tool is applicable for your project.
Life Cycle Stages
The Advancing Net Zero Energy Rating Scheme — Version 1.0.0 is applicable to projects that are at the design, construction and operations stages.
Tag | Name | Description |
---|---|---|
S1Stage 1 — Design | Stage 1 — Design | The design stage includes the conception and strategic planning of the project goals, expected outcomes and requirements. The design stage also includes the preparation of the detailed design and the start of the procurement process for products and services specified in the project. Projects at this stage focuses on the integrated process in planning the project and addressing the client's requirements and the sustainability targets for the project. |
S2Stage 2 — Construction | Stage 2 — Construction | The construction stage includes the site preparation and construction activities in the implementation of the design of the project. The construction stage also includes the monitoring and inspection of the construction progress and quality, and the successful completion of the commissioning process for the building. Projects at this stage focuses on the implementation and delivery of the project until its practical completion before its official handover. |
S3Stage 3 — Operations | Stage 3 — Operations |
The operations stage includes activities for the use of the building by the project users, maintenance of the building systems and spaces, and continuous management and improvement of the operations of the project. Projects at this stage focuses on planning and implementing the operational policies and procedures for the project. |
Project Type
The rating scheme is applicable to the whole building design, construction and operations, or for tenant projects within a building.
Tag | Name | Description |
---|---|---|
Buildings | Buildings | Building projects refers to the whole building design and construction, or operations. The scope of the project includes areas that are designed, constructed or managed by the project owner and its project team. |
Tenants | Tenants | Tenant projects refers to projects areas that are owned or leased, and managed by the project owner within a building. |
Occupancy Type
The rating tool may be used for the following occupancy types.
Addenda
26 September 2022, v1.1.0 Added descriptions for the different occupancy types.
Tag | Name | Description |
---|---|---|
Office | Office spaces and buildings | Office spaces and buildings may include private or government offices. |
Retail | Retail spaces and buildings | Retail spaces and buildings may include:
|
Vertical residential | Vertical residential buildings | Vertical residential buildings are buildings six (6) floors and above. Vertical residential buildings may include:
|
Clustered residential | Clustered residential buildings | Clustered residential buildings five (5) floors and below with multiple buildings and shared utilities. Clustered residential buildings may include:
This does not apply to subdivision or residential district projects. |
Educational | Educational spaces and buildings | Education spaces and buildings may include:
|
Industrial | Industrial buildings | Industrial buildings may include buildings for industrial processes, which may include:
It may also include warehouses and storage. |
Minimum System Requirements
The Minimum System Requirements aim to:
- Establish the basic requirements for projects undergoing certification under the ANZ/PH Program;
- Ensure projects comply with building and environmental laws, regulations and mandatory standards prior to certification under ANZ/PH; and
- Ensure projects have clear commitment to designing, constructing and operating their net zero project.
Projects that are applying for Advancing Net Zero Philippines Certification must comply with the minimum system requirements.
Requirements
No. | Minimum System Requirement |
---|---|
MSR-01 | Regulatory compliance |
MSR-02 | Distinct and clear boundaries |
MSR-03 | Disclosure of resource performance data |
MSR-04 | Construction activity pollution and control |
MSR-01 Regulatory compliance
This requirement aims to ensure that the project is complying with all building and environmental laws, regulations, and mandatory standards applicable to the project.
The project team must conduct a regulatory compliance review for the project to identify and assess compliance with the following:
- Relevant laws, regulations, and mandatory standards governing the practice of building design, construction, and operations;
- Relevant laws, regulations, and mandatory standards environmental requirements affecting the building performance; and
- Local ordinances applicable to the project.
Compliance Notes
Registration
During registration, the project team must submit report on the regulatory compliance review for the project, which should include information on:
- All applicable building and environmental laws, regulations for the project, and
- Status of compliance of the project with the applicable regulations.
All Stages
During assessment, the project team must submit:
- Report on the regulatory compliance review for the project, which should include information on:
- All applicable building and environmental laws, regulations for the project, and
- Status of compliance of the project with the applicable regulations.
- Copy of the approved Building Permit issued by the local government where the project is located;
- If the project is under operations, copy of the approved Occupancy Permit issued by the local government where the project is located; and
- Permits and issuances by the national and local government to show compliance with all relevant building and environmental laws, regulations, and mandatory standards with regards to the design, construction and operations of the project.
MSR-02 Distinct and clear boundaries
This requirement aims to establish a clear scope for the project by defining the physical boundaries of the project.
The project team must establish the scope for the project, which must include the following:
- Physical boundaries of the project, and
- Locations of shared building systems and utilities.
Compliance Notes
Registration
During registration, the project team must submit plans showing clearly the boundaries of the project for certification, which should include:
- Site development plan reflecting the following:
- Project site, and
- Building footprint;
- Architectural plans reflecting the following:
- Scope of the project, and
- Location of on-site shared building systems and utilities.
All Stages
During assessment, the project team must submit proof of the capacity of the on-site shared building systems and utilities, which must reflect the following:
- The capacity of the on-site shared building systems and utilities are sufficient for the project and other projects; and
- There is dedicated capacity allotted for the project.
MSR-03 Disclosure of resource performance data
This requirement aims to:
- Ensure the project owner is committed to the certification process by disclosing the resource performance data of their project.
- Ensure consistency in the submission of performance data for the assessment of the project.
The project team must:
- Use the metric system; and
- Submit the energy performance data of the project.
Compliance Notes
Registration
During registration, the project team must submit all project documentation containing dimensions or units of measurement using the metric system.
All Stages
During assessment, the project team must submit:
- Project documentation containing dimensions or units of measurement using the metric system; and
- Reports on the energy performance of the project, which should include:
- Projected or actual annual energy consumption in kWh per energy end use,
- Projected or actual annual total energy consumption in kWh,
- Projected or actual energy use intensity in kWh/m2, and
- Projected or actual equivalent energy intensity in kWh/m2 for the potential renewable energy production.
MSR-04 Construction activity pollution prevention and control
This requirement aims to:
- Ensure proper waste and pollution management are established and implemented in the project; and
- Monitor and evaluate the management of wastes and pollution in construction activities for the project.
The project team must:
- Conduct a site assessment prior to any construction activities.
- Establish a construction activity pollution prevention and control plan.
- Implement and monitor the implementation of the construction activity pollution prevention and control plan.
- Evaluate the implementation of the construction activity pollution prevention and control plan.
Compliance Notes
All Stages
The project team must submit:
- Report on the site assessment prior to the demolition and construction activities, which should include:
- Expected sources of pollution in the project; and
- Potential impact of the activities to its surroundings;
- Construction activity pollution prevention and control plan, which should include:
- Plans and specifications for the strategies to control or prevent the expected pollution sources in the project;
- Documented policies and procedures for the following:
- Proper implementation of the identified strategies;
- Inspection, monitoring and reporting on the implementation of the strategies;
- Reporting issues in the implementation of the strategies;
- Identification and implementation of corrective actions during and after construction; and
- Evaluation of the site and effectivity of the strategies after construction.
- Communication records to the project team on the documented policies and procedures.
- Report on the evaluation of the implementation of the plan, which must include:
- Issues or challenges identified during construction;
- Corrective actions implemented to address the issues; and
- Recommendations for further improvement on the plan.
Advancing Net Zero Energy
Net zero energy is the conservation and optimization of the energy use in projects, and the use of the renewable energy for the project's remaining operational energy demand.
Addenda
26 September 2022, v1.1.0 Changed "Advancing Net Zero Energy Rating Scheme" to "Advancing Net Zero Energy rating scheme".
Under the Advancing Net Zero Energy rating scheme, projects may be certified when they demonstrate a holistic approach to energy performance, through energy efficiency and conservation and the use of renewable energy.
Purpose and Intent
This rating scheme aims to:
- Conserve energy through passive design strategies;
- Optimize the energy use in projects through active energy efficiency and conservation strategies; and
- Reduce the use of fossil fuel based electricity through the use of renewable energy.
Requirements
Addenda
26 September 2022, v1.1.0 Added the general requirements for the rating scheme, including the requirement to
Reduce the overall energy demand of the project by 40%
through Conserve and Optimize strategies.
The project team must:
- Reduce the overall energy demand of the project by 40% compared to its base case, through:
- Conserving energy with passive design strategies, and
- Optimizing energy use with active energy efficient strategies.
- Use renewable energy for the remaining operational energy demand of the project.
Stage 1 — Design
Addenda
26 September 2022, v1.1.0
- Changed `The project owner should commit` to `The project owner must commit`.
- Changed:
- Percentage energy consumption reduction attributed to:
- Passive design strategies to conserve energy; and
- Active energy efficient technologies and products to optimize energy use.
- Percentage total energy consumption reduction compared to the energy base case.
to:
- Energy performance, which is the total of the following:
- Percentage operational energy reduction from conservation strategies compared to the project's base case,
- Percentage operational energy reduction from optimization strategies compared to the project's base case, and
- Percentage of the energy supply from on-site and off-site renewable energy compared to the project's operational energy demand.
The project owner must commit to advancing net zero energy through conserving energy, optimizing energy user, and using renewable energy in the design, construction, and operations of the project.
The project team must:
- Engage qualified and competent professionals in designing the project to advance towards net zero energy for the project.
- Establish an energy base case. The energy base case must include the following:
- Annual operational energy consumption in kWh per energy end use,
- Annual total operational energy consumption in kWh, and
- Energy use intensity in kWh/m2.
- Design the project that incorporates the following:
- Passive design strategies for energy conservation,
- Active energy efficient technologies and products, and
- Renewable energy system.
- Establish an energy metering and monitoring system.
- Establish an energy design case. The energy design case must include the following:
- Annual operational energy consumption in kWh per energy end use based on the design of the project,
- Annual total operational energy consumption in kWh,
- Energy use intensity in kWh/m2,
- Energy performance, which is the total of the following:
- Percentage operational energy reduction from conservation strategies compared to the project's base case,
- Percentage operational energy reduction from optimization strategies compared to the project's base case, and
- Percentage of the energy supply from on-site and off-site renewable energy compared to the project's operational energy demand.
Addenda
26 September 2022, v1.1.0 Added a list of energy end uses.
Energy end use
Energy end use refers to energy-related building systems, which should include:
- Lighting,
- Internal equipment loads, including:
- Pumps and motors,
- Process loads, and
- Plug loads;
- Service water heating,
- Space cooling and heat rejection equipment, and
- Other HVAC system equipment.
Conserve
Addenda
26 September 2022, v1.1.0
- Changed
Projects should prioritize energy conservation
toProjects must prioritize energy conservation
.- Changed
If the project team will be pursuing passive design strategies to conserve energy,
toIf the project team will be incorporating passive design strategies to conserve energy,
.- Removed
1. Establish a policy to prioritize passive design strategies to conserve energy for the project.
and2. Communicate the policy to the project team members.
- Changed:
- Compute for the potential reduction in the operational energy consumption. The reduction must be presented in:
- Energy consumption reduction in kWh/m2, and
- Percentage of reduction compared to the energy base case.
to:
- Present the projected reduction in the operational energy demand of the project. The reduction must be presented in:
- Energy consumption reduction attributed to each of the specified conservation strategies in kWh/m2,
- Total energy consumption reduction due to the conservation strategies in kWh/m2,
- Percentage reduction attributed to each of the specified conservation strategies compared to the energy base case, and
- Total percentage reduction attributed to conservation compared to the energy base case.
Projects must prioritize energy conservation using passive energy design strategies to ensure the potential operational energy demand is kept at a minimum.
During design, the project team should consider the local climate and site conditions to reduce the building cooling requirements, and the use of passive design strategies to reduce the need for energy consuming active systems in the project.
If the project team will be incorporating passive design strategies to conserve energy, the project team must:
- Identify the appropriate passive design strategies for the project. Passive design strategies should include the following:
- The proper design of the building envelope to:
- Reduce heat gain, and
- Reduce air and moisture infiltration in air-conditioned spaces.
- The use of natural ventilation to reduce the need for active cooling technologies;
- The use of daylight to reduce the need for artificial lighting; and
- The use of co-generation and tri-generation systems to maximize energy use in the project.
- The proper design of the building envelope to:
- Present the projected reduction in the operational energy demand of the project. The reduction must be presented in:
- Energy consumption reduction attributed to each of the specified conservation strategies in kWh/m2,
- Total energy consumption reduction due to the conservation strategies in kWh/m2,
- Percentage reduction attributed to each of the specified conservation strategies compared to the energy base case, and
- Total percentage reduction attributed to conservation compared to the energy base case.
- Establish the proper use and maintenance of the energy conservation strategies for the operations of the project.
Optimize
Addenda
26 September 2022, v1.1.0
- Removed
Projects should optimize energy use to ensure energy is not wasted and is used efficiently to maintain comfort levels and productivity in the project.
- Removed
1. Establish a procurement policy on the use of energy efficient products and services.
and2. Communicate the policy to the project team members.
- Changed:
- Compute for the potential reduction in the operational energy consumption. The reduction must be presented in:
- Energy consumption reduction in kWh/m2, and
- Percentage of reduction compared to the energy base case.
to:
- Present the projected reduction to the operational energy demand of the project. The reduction must be presented in the following:
- Energy consumption reduction attributed to each of the specified optimization strategies in kWh/m2,
- Total energy consumption reduction due to the optimization strategies in kWh/m2,
- Percentage reduction attributed to each of the specified optimization strategies compared to the energy base case, and
- Total percentage reduction attributed to optimization compared to the energy base case.
During design, the project team should prioritize the specification and procurement of energy-efficient products and services to reduce the potential energy use in the operations of the project.
If the project team will be specifying active energy efficiency strategies, the project team must:
- Identify the appropriate energy efficient technologies that will reduce the energy use of the project. Energy efficiency strategies should include the specification and procurement of energy efficient equipment and technologies, including:
- HVAC and refrigeration systems,
- Lighting, and
- Pumps and motors.
- Present the projected reduction to the operational energy demand of the project. The reduction must be presented in the following:
- Energy consumption reduction attributed to each of the specified optimization strategies in kWh/m2,
- Total energy consumption reduction due to the optimization strategies in kWh/m2,
- Percentage reduction attributed to each of the specified optimization strategies compared to the energy base case, and
- Total percentage reduction attributed to optimization compared to the energy base case.
- Establish the proper use and maintenance of the energy efficient technologies for the operations of the project.
Renew
Addenda
26 September 2022, v1.1.0
- Removed
1. Establish a policy for the use of renewable energy for the operations of the project.
and2. Communicate the policy to the project team members.
- Reformatted the presentation of the options for Renew, including the following:
- Removed
2. If the project will be using on-site renewable energy:
,1. Identify the appropriate on-site renewable energy system for the project.
, and2. Present the potential annual renewable energy that will be generated by the on-site renewable energy system.
- Changed
energy production
toenergy generation
, and- Changed
Annual energy production equivalent in kWh/m2,
toAnnual energy quantity in kW,
andAnnual energy generation in kWh,
Projects should use renewable energy to reduce the demand for non-renewable energy resource.
During design, the project team should establish a renewable energy supply based on the potential operational energy demand of the project.
If the project will be using renewable energy, the project team must:
- Identify the appropriate renewable energy system for the project. The project should:
- Generate power using on-site renewable energy,
- Engage a registered retail electricity supplier to supply renewable energy for at least three (3) years from the start of the operations, or
- Use a combination of on-site and off-site renewable energy.
- Present the energy generation equivalent of the renewable energy system specified in the project. Present the energy generation as the following:
- Annual energy quantity in kW,
- Annual energy generation in kWh, and
- Percentage of the projected annual energy generation compared to the operational energy demand in the energy base case.
- Establish policies and procedures for the continuous use of renewable energy in the project's operations.
If the project will be using off-site renewable energy, the project must be supplied with 100% renewable energy based on its projected operational energy demand.
Stage 2 — Construction
Addenda
26 September 2022, v1.1.0
- Changed
The project team should:
toThe project team must:
- For 4. Establish an energy as-built case, replaced the information required to:
- Annual operational energy consumption in kWh per energy end use based on the design of the project,
- Annual total operational energy consumption in kWh,
- Energy use intensity in kWh/m2,
- Energy performance, which is the total of the following:
- Percentage operational energy reduction from conservation strategies compared to the project's base case,
- Percentage operational energy reduction from optimization strategies compared to the project's base case, and
- Percentage of the energy supply from on-site and off-site renewable energy compared to the project's operational energy demand.
The project team must:
- Implement the energy strategies in the project including the following:
- Passive energy conservation design strategies,
- Active energy efficient technologies and products, and
- Renewable energy system.
- Install the energy metering and monitoring system.
- Conduct testing and commissioning for all energy-related building systems implemented in the project.
- Establish an energy as-built case. The energy as-built case must include the following:
- Annual operational energy consumption in kWh per energy end use based on the design of the project,
- Annual total operational energy consumption in kWh,
- Energy use intensity in kWh/m2,
- Energy performance, which is the total of the following:
- Percentage operational energy reduction from conservation strategies compared to the project's base case,
- Percentage operational energy reduction from optimization strategies compared to the project's base case, and
- Percentage of the energy supply from on-site and off-site renewable energy compared to the project's operational energy demand.
Conserve
Addenda
26 September 2022, v1.1.0
- Removed
Projects should prioritize energy conservation using passive design strategies to ensure the potential operational energy demand is kept at a minimum.
- Changed:
- Compute for the potential reduction in the operational energy consumption. The reduction must be presented in:
- Energy consumption reduction in kWh/m2, and
- Percentage of reduction compared to the energy base case.
to:
- Present the projected reduction in the operational energy demand of the project. The reduction must be presented in:
- Energy consumption reduction attributed to each of the specified conservation strategies in kWh/m2,
- Total energy consumption reduction due to the conservation strategies in kWh/m2,
- Percentage reduction attributed to each of the specified conservation strategies compared to the energy base case, and
- Total percentage reduction attributed to conservation compared to the energy base case.
During construction, the project team should implement the passive design strategies in the project's design to ensure the potential operational energy demand is kept at a minimum.
If the project team will be implementing passive design strategies to conserve energy, the project team must:
- Implement the passive design strategies in the project.
- Conduct testing and commissioning for the passive design strategies implemented in the project.
- Present the projected reduction in the operational energy demand of the project. The reduction must be presented in:
- Energy consumption reduction attributed to each of the specified conservation strategies in kWh/m2,
- Total energy consumption reduction due to the conservation strategies in kWh/m2,
- Percentage reduction attributed to each of the specified conservation strategies compared to the energy base case, and
- Total percentage reduction attributed to conservation compared to the energy base case.
Optimize
Addenda
26 September 2022, v1.1.0
- Removed
Projects should optimize energy use to ensure energy is not wasted and is used efficiently to maintain comfort levels and productivity in the project.
- Changed:
- Compute for the potential reduction in the operational energy consumption. The reduction must be presented in:
- Energy consumption reduction in kWh/m2, and
- Percentage of reduction compared to the energy base case.
to:
- Present the projected reduction to the operational energy demand of the project. The reduction must be presented in the following:
- Energy consumption reduction attributed to each of the specified optimization strategies in kWh/m2,
- Total energy consumption reduction due to the optimization strategies in kWh/m2,
- Percentage reduction attributed to each of the specified optimization strategies compared to the energy base case, and
- Total percentage reduction attributed to optimization compared to the energy base case.
During construction, the project team should procure and implement the specified energy-efficient products and services to reduce the potential operational energy demand of the project.
If the project team will be implementing active energy efficiency strategies, the project team must:
- Implement the appropriate energy efficiency strategies that will reduce the energy use of the project.
- Conduct the commissioning and testing for the energy efficiency strategies.
- Present the projected reduction to the operational energy demand of the project. The reduction must be presented in the following:
- Energy consumption reduction attributed to each of the specified optimization strategies in kWh/m2,
- Total energy consumption reduction due to the optimization strategies in kWh/m2,
- Percentage reduction attributed to each of the specified optimization strategies compared to the energy base case, and
- Total percentage reduction attributed to optimization compared to the energy base case.
Renew
Addenda
26 September 2022, v1.1.0
- Removed
Projects should use renewable energy to reduce the demand for non-renewable energy resource.
- Reformatted the presentation of the options for Renew, including the following:
- Combined the requirements for on-site and off-site renewable energy,
- Added the requirement to present the energy generation in annual energy quantity in kW, annual energy generation in kWh, and percentage of the projected annual energy generation compared to the operational energy demand in the energy base case.
During construction, the project team should implement the renewable energy system identified during design that will supply renewable energy for the projected operational energy demand of the project.
If the project will be using renewable energy, the project team must:
- Implement the specified renewable energy system in the design of the project.
- Present the energy generation equivalent of the renewable energy system specified in the project. Present the energy generation as the following:
- Annual energy quantity in kW,
- Annual energy generation in kWh, and
- Percentage of the projected annual energy generation compared to the operational energy demand in the energy base case.
- Conduct the commissioning and testing for the renewable energy system.
If the project will be using off-site renewable energy, the project must be supplied with 100% renewable energy based on its projected operational energy demand.
Stage 3 — Operations
Addenda
26 September 2022, v1.1.0 Changed "Establish an energy base case. The base case must include the review the implementation of all energy-related building systems..." to:
Establish an energy base case using:
- An energy model of the project's code-compliant design, or
- The actual energy consumption prior to the project's performance period for 12 months.
The project owner must commit to the continuous improvement in energy performance and advancing net zero energy in the operations of the project.
The project team must:
- Engage qualified and competent professionals in managing energy in the operations of the project.
- Establish an energy base case using:
- An energy model of the project's code-compliant design, or
- The actual energy consumption prior to the project's performance period for 12 months.
- Establish the following:
- Strategies to improve the energy performance of the project; and
- Policies and procedures for the management of energy use in the project.
- Implement the following:
- Strategies to improve the energy performance of the project; and
- Policies and procedures for energy management.
- Monitor the energy management and performance of the project for at least twelve (12) months during the performance period. The monitoring should include the following:
- Implementation of the energy conservation and efficiency strategies,
- Use of renewable energy, and
- Implementation of the policies and procedures for the management of energy use in the project.
- Evaluate the effectivity of the energy management and performance, and identify recommendations to improve the energy performance of the project.
- Demonstrate how the project reduced the operational energy consumption of the project. The reduction must be a comparison of the project's operations performance to the energy base case.
The base case must include the review the implementation of all energy-related building systems, including the following:
- Passive energy conservation design strategies,
- Active energy efficient technologies and products, and
- Renewable energy system.
Conserve
Addenda
26 September 2022, v1.1.0 Changed
4. Present the actual reduction in the operational energy consumption in kWh/m<sup>2</sup> based on the implemented energy conservation strategies.
to:
- Present the actual reduction in the operational energy demand of the project. The reduction must be presented in:
- Energy consumption reduction attributed to all of the specified conservation strategies in kWh/m2,
- Total energy consumption reduction due to the conservation strategies in kWh/m2,
- Percentage reduction attributed to each of the specified conservation strategies compared to the energy base case, and
- Total percentage reduction attributed to conservation compared to the energy base case.
Projects should prioritize energy conservation strategies to ensure the operational energy demand is kept at a minimum.
During operations, the project team review the use of passive design strategies and continuously implement energy conservation strategies to reduce the need for energy consuming active systems in the project.
If the project team is continuing the implementation of energy conservation strategies, the project team must:
- Evaluate the effectivity of the passive design and energy conservation strategies during the base case period of the project.
- Identify appropriate energy conservation strategies to further improve the energy performance of the project.
- Implement the energy conservation strategies.
- Present the actual reduction in the operational energy demand of the project. The reduction must be presented in:
- Energy consumption reduction attributed to all of the specified conservation strategies in kWh/m2,
- Total energy consumption reduction due to the conservation strategies in kWh/m2,
- Percentage reduction attributed to each of the specified conservation strategies compared to the energy base case, and
- Total percentage reduction attributed to conservation compared to the energy base case.
Optimize
Addenda
26 September 2022, v1.1.0
- Removed
Projects should optimize energy use to ensure energy is not wasted and is used efficiently to maintain comfort levels and productivity in the project.
- Changed
during the base case period
toprior to the performance period
- Changed
4. Present the actual reduction in the operational energy consumption in kWh/m<sup>2</sup> based on the implemented energy conservation strategies.
to:
- Present the actual reduction in the operational energy demand of the project. The reduction must be presented in:
- Energy consumption reduction attributed to each of the implemented optimization strategies in kWh/m2,
- Total energy consumption reduction due to the optimization strategies in kWh/m2,
- Percentage reduction attributed to each of the implemented optimization strategies compared to the energy base case, and
- Total percentage reduction attributed to optimization compared to the energy base case.
During operations, the project team should properly use energy-efficient products and services to reduce the energy used in the operations of the project.
If the project team is using active energy efficiency strategies, the project team must:
- Evaluate the effectivity of the use of energy-efficient strategies prior to the performance period of the project.
- Identify improvements in the use of energy-efficient technologies to further improve the energy performance in the project.
- Implement the energy efficiency strategies.
- Present the actual reduction in the operational energy demand of the project. The reduction must be presented in:
- Energy consumption reduction attributed to each of the implemented optimization strategies in kWh/m2,
- Total energy consumption reduction due to the optimization strategies in kWh/m2,
- Percentage reduction attributed to each of the implemented optimization strategies compared to the energy base case, and
- Total percentage reduction attributed to optimization compared to the energy base case.
Renew
Addenda
26 September 2022, v1.1.0
- Removed
Projects should use renewable energy to reduce the demand for non-renewable energy resource.
- Reformatted the presentation of the options for Renew, including the following:
- Combined the requirements for on-site and off-site renewable energy,
- Added the requirement to present the energy generation in annual energy quantity in kW, annual energy generation in kWh, and percentage of the annual energy generation compared to the operational energy demand in the energy base case.
During operations, the project team should use renewable energy for the reduced operational energy demand of the project.
If the project is using renewable energy, the project team must:
- Evaluate the effectivity of the use of renewable energy prior to the performance period of the project.
- Identify improvements in the use of renewable energy in the project.
- Present the energy generation equivalent of the renewable energy system specified in the project. Present the energy generation as the following:
- Annual energy quantity in kW,
- Annual energy generation in kWh, and
- Percentage of the annual energy generation compared to the operational energy demand in the energy base case.
If the project will be using off-site renewable energy, the project must be supplied with 100% renewable energy based on its operational energy demand.
Rating
Addenda
26 September 2022, v1.1.0
- Changed
remaining operational energy demand from non-renewable energy sources
toproject's energy performance
.- Changed the presentation of the rating to:
- 1 Star is 40% to less than 52% for Good practice,
- 2 Stars is 52% to less than 64% for Ideal practice,
- 3 Stars is 64% to less than 76% for Exemplar performance
- 4 Stars is 76% to less than 88% for Country leader, and
- 5 Stars is 88% to 100% for World class.
- Added the following description for energy performance:
The project's energy performance is the total of the:
- percentage operational energy reduction from conservation and optimization strategies compared to the project's base case, and
- percentage of the energy supply from on-site and off-site renewable energy compared to the project's operational energy demand.
The project may be awarded with a rating based on how it is advancing towards net zero through conserving energy, optimizing energy use, and using renewable energy.
The project may be awarded with: | if the project's energy performance is: | ||
---|---|---|---|
★ | 1 Star | 40% to less than 52% | Good practice |
★★ | 2 Stars | 52% to less than 64% | Ideal practice |
★★★ | 3 Stars | 64% to less than 76% | Exemplar performance |
★★★★ | 4 Stars | 76% to less than 88% | Country leader |
★★★★★ | 5 Stars | 88% to 100% | World class |
The project's energy performance is the total of the:
- percentage operational energy reduction from conservation and optimization strategies compared to the project's base case, and
- percentage of the energy supply from on-site and off-site renewable energy compared to the project's operational energy demand.
The project may also be awarded as a Net Zero Energy project when it has reduced its energy demand through conserving and optimizing energy use, and using 100% renewable energy for the remaining operational energy demand of the project.
Compliance Notes
Stage 1 — Design
Addenda
26 September 2022, v1.1.0
- Changed
Policy document
toDocumented policy
.- For 5. Specifications, changed
Quality and performance details for—
toQuality and performance details for the following:
.- For 6. Energy design case report, removed
Analysis how the project team selected the final design option for the project,
and added:
- Energy performance, which is the total of the following:
- Percentage operational energy reduction from conservation strategies compared to the project's base case,
- Percentage operational energy reduction from optimization strategies compared to the project's base case, and
- Percentage of the energy supply from on-site and off-site renewable energy compared to the project's operational energy demand.
The project team should submit the following:
- Documented policy reflecting the commitment of the project owner to advancing net zero energy in the project.
- Proof of engagement for qualified and competent professionals, which must include:
- Qualifications and competency in designing using passive strategies to conserve energy, energy efficiency strategies to reduce the energy demand, and renewable energy;
- Responsibilities of the professionals for the project; and
- Period of engagement of the professional for the project.
- Energy base case report.
- Plans reflecting the following information:
- All energy-related building systems in the project, which should include:
- Building envelope,
- HVAC systems,
- Lighting and daylighting systems,
- Pumps and motors, and
- Receptacle loads.
- Energy meters, and
- Scope of each energy meter.
- All energy-related building systems in the project, which should include:
- Specifications reflecting the following information:
- Quality and performance details for the following:
- All energy-related building systems in the project,
- Passive design strategies in the project,
- Active energy efficient strategies in the project,
- Renewable energy system, and
- Energy meters.
- Scope of each meter.
- Quality and performance details for the following:
- Energy design case report containing the following information:
- Annual operational energy consumption in kWh per energy end use based on the design of the project,
- Annual total operational energy consumption in kWh,
- Energy use intensity in kWh/m2,
- Energy performance, which is the total of the following:
- Percentage operational energy reduction from conservation strategies compared to the project's base case,
- Percentage operational energy reduction from optimization strategies compared to the project's base case, and
- Percentage of the energy supply from on-site and off-site renewable energy compared to the project's operational energy demand.
- Policies and procedures for the proper use and maintenance of all energy-related building systems, including:
- The proper use and maintenance of all energy-related building systems for the project owner and building manager; and
- The design and construction requirements for tenant fit-outs.
Conserve
Addenda
26 September 2022, v1.1.0 For 6. Energy design case report, changed
potential reduction
toprojected reduction
, and changed:
- Potential annual reduction in operational energy consumption in kWh/m2, and
- Percentage of the reduction compared to the total annual operational energy consumption established in the energy base case.
to:
- Energy consumption reduction attributed to each of the specified conservation strategies in kWh/m2,
- Total energy consumption reduction due to the conservation strategies in kWh/m2,
- Percentage reduction attributed to each of the specified conservation strategies compared to the energy base case, and
- Total percentage reduction attributed to conservation compared to the energy base case.
If the project team will be pursuing passive design strategies to conserve energy, the project team should also submit the following:
- Documented policy of the project owner on prioritizing passive design strategies to conserve energy for the project.
- Communication records reflecting the policy on passive design strategies was effectively communicated to the project team members.
- Plans reflecting the passive design strategies in the project.
- Specifications reflecting the quality and performance details of each of the passive design strategies in the project.
- Purchase orders reflecting the specified passive design strategies in the project.
- Energy design case report containing the computation for the projected reduction in the operational energy consumption attributed to the passive design strategies. The projected reduction must be presented in the following:
- Energy consumption reduction attributed to each of the specified conservation strategies in kWh/m2,
- Total energy consumption reduction due to the conservation strategies in kWh/m2,
- Percentage reduction attributed to each of the specified conservation strategies compared to the energy base case, and
- Total percentage reduction attributed to conservation compared to the energy base case.
- Policies and procedures for the proper use and maintenance of the passive design strategies in the project.
Optimize
Addenda
26 September 2022, v1.1.0 For 6. Energy design case report, changed
potential reduction
toprojected reduction
, and changed:
- Potential annual reduction in operational energy consumption in kWh/m2, and
- Percentage of the reduction compared to the total annual operational energy consumption established in the energy base case.
to:
- Energy consumption reduction attributed to each of the specified conservation strategies in kWh/m2,
- Total energy consumption reduction due to the conservation strategies in kWh/m2,
- Percentage reduction attributed to each of the specified conservation strategies compared to the energy base case, and
- Total percentage reduction attributed to conservation compared to the energy base case.
If the project team will be specifying active energy efficiency strategies, the project team should also submit the following:
- Documented policy of the project owner for procurement and use of energy efficient products and services.
- Communication records reflecting the how the procurement policy for energy efficient products and services was effectively communicated to the project team members.
- Plans reflecting the energy efficiency strategies in the design of the project.
- Specifications reflecting the quality and performance details of the identified energy efficient strategies in the project.
- Purchase orders reflecting the specified energy efficient strategies in the project.
- Energy design case report containing the computation for the potential reduction in the operational energy consumption attributed to the energy efficient strategies in the project. The potential reduction must be presented in the following:
- Energy consumption reduction attributed to each of the specified optimization strategies in kWh/m2,
- Total energy consumption reduction due to the optimization strategies in kWh/m2,
- Percentage reduction attributed to each of the specified optimization strategies compared to the energy base case, and
- Total percentage reduction attributed to optimization compared to the energy base case.
- Policies and procedures for the proper use and maintenance of the energy efficient strategies in the project.
Renew
Addenda
26 September 2022, v1.1.0 For 6. Energy design case report, changed
potential energy production
toprojected energy production
, and changed:
- Equivalent energy intensity in kWh/m2 for the potential renewable energy production, and
- Percentage of the equivalent energy intensity for the renewable energy production compared to the total annual operational energy consumption established in the energy base case.
to:
- Annual energy quantity in kW,
- Annual energy generation in kWh, and
- Percentage of the projected annual energy generation compared to the operational energy demand in the energy base case.
If the project will be using renewable energy, the project team should also submit the following:
- Documented policy of the project owner for the use of renewable energy for the operational energy use of the project.
- Communication records reflecting policy for renewable energy was effectively communicated to the project team members.
- Feasibility study reflecting the considerations and analysis of the project team on what type of renewable energy is appropriate and will be used for the project.
- Energy design case report containing the computation for the projected annual energy generation. The projected energy generation must be presented in the following:
- Annual energy quantity in kW,
- Annual energy generation in kWh, and
- Percentage of the projected annual energy generation compared to the operational energy demand in the energy base case.
- Policies and procedures for the continuous use and maintenance of the renewable energy in the project's operations.
If the project will be using on-site renewable energy, the project team should also submit the following:
- Plans reflecting the location of the renewable energy system specified for the project.
- Specifications reflecting the renewable energy system specified in the project, including the following information:
- Type of renewable energy system,
- Quality requirements for the renewable energy system, and
- Performance requirement including the potential energy generation.
- Proof of the procurement of the renewable energy system, which should include:
- Purchase order reflecting the purchase of the specified renewable energy system, or
- Service contract reflecting the procurement of on-site renewable energy services from third-party service providers. If the on-site renewable energy system is leased by the project owner, the service contract must reflect the:
- Specifications of the selected renewable energy system compliant with the performance requirements for the project, and
- Duration of the lease or use of the system for at least three (3) years from the start of the operations of the project.
If the project will be using off-site renewable energy, the project team should also submit the approved supply contract with a registered retail electricity supplier reflecting the following:
- The duration of the supply must be for at least three (3) years from the start of the project's operations; and
- The renewable energy supply must be equivalent to 100% of the potential annual operational energy consumption established in the energy design case.
Stage 2 — Construction
The project team should submit the following:
- As-built plans reflecting the following information:
- All energy-related building systems in the project, which should include:
- Building envelope,
- HVAC systems,
- Lighting and daylighting systems,
- Pumps and motors, and
- Receptacle loads.
- Energy meters, and
- Scope of each energy meter.
- All energy-related building systems in the project, which should include:
- As-built specifications reflecting the following information:
- Quality and performance details for—
- All energy-related building systems in the project,
- Passive design strategies in the project,
- Active energy efficient strategies in the project,
- Renewable energy system, and
- Energy meters.
- Scope of each meter.
- Quality and performance details for—
- Commissioning report reflecting all energy-related building systems were successfully installed, tested and evaluated. The commissioning report must contain the confirmation that all energy-related building systems meet the performance requirements based on the design of the project.
- Energy as-built case report containing the following information:
- Annual energy consumption in kWh per energy end use,
- Annual total energy consumption in kWh, and
- Energy use intensity in kWh/m2.
Conserve
If the project team will be implementing passive design strategies to conserve energy, the project team should also submit the following:
- As-built plans reflecting the passive design strategies in the project.
- As-built specifications reflecting the quality and performance details of each of the passive design strategies in the project.
- Procurement records, which should include purchase orders, service contracts and official receipts or sales invoices.
- Installation records
- Photographs
- Commissioning report reflecting the passive energy design strategies were successfully installed, tested and evaluated.
- Energy as-built case report containing the computation for the potential reduction in the operational energy consumption attributed to the passive design strategies. The potential reduction must be presented in the following:
- Potential annual reduction in operational energy consumption in kWh/m2, and
- Percentage of the reduction compared to the total annual operational energy consumption established in the energy base case.
Optimize
If the project team will be implementing active energy efficiency strategies, the project team should also submit the following:
- As-built plans reflecting the energy efficiency strategies implemented in the project.
- As-built specifications reflecting the quality and performance details of each of the energy efficiency strategies implemented in the project.
- Procurement records, which should include purchase orders, service contracts and official receipts or sales invoices.
- Installation records
- Photographs
- Commissioning report reflecting the energy efficiency strategies were successfully installed, tested and evaluated.
- Energy as-built case report containing the computation for the potential reduction in the operational energy consumption attributed to the energy efficiency strategies. The potential reduction must be presented in the following:
- Potential annual reduction in operational energy consumption in kWh/m2, and
- Percentage of the reduction compared to the total annual operational energy consumption established in the energy base case.
Renew
If the project will be using renewable energy, the project team should also submit the following:
- Energy as-built case report containing the computation for the potential annual renewable energy production. The potential renewable energy generation must be presented in the following:
- Equivalent energy intensity in kWh/m2 for the potential renewable energy production, and
- Percentage of the equivalent energy intensity for the renewable energy production compared to the total annual operational energy consumption established in the energy base case.
- Commissioning report reflecting the renewable energy systems were successfully installed, tested and evaluated.
If the project will be using on-site renewable energy, the project team should also submit:
- As-built plans reflecting the location of the renewable energy system specified for the project.
- As-built specifications reflecting the renewable energy system specified in the project, including the following information:
- Type of renewable energy system,
- Quality requirements for the renewable energy system, and
- Performance requirement including the potential energy generation.
- Proof of the procurement of the renewable energy system, which should include:
- Purchase order reflecting the purchase of the specified renewable energy system, or
- Service contract reflecting the procurement of on-site renewable energy services from third-party service providers. If the on-site renewable energy system is leased by the project owner, the service contract must reflect the:
- Specifications of the selected renewable energy system compliant with the performance requirements for the project, and
- Duration of the lease or use of the system for at least three (3) years from the start of the operations of the project.
If the project will be using off-site renewable energy, the project team should also submit the approved supply contract with a registered retail electricity supplier reflecting the following:
- The duration of the supply must be for at least three (3) years from the start of the project's operations; and
- The renewable energy supply must be equivalent to 100% of the potential annual operational energy consumption established in the energy design case.
Stage 3 — Operations
The project team should submit the following:
- Documented policy reflecting the commitment of the project owner to continuously improve the energy performance and advance net zero energy in the operations of the project.
- Proof of engagement for qualified and competent professionals, which must include:
- Qualifications and competency in the operations of the project and improving the energy performance of the project using passive strategies to conserve energy, energy efficiency strategies to reduce the energy demand, and renewable energy;
- Responsibilities of the professionals for the project; and
- Period of engagement of the professional for the project.
- Energy base case report.
- As-built plans reflecting the following information:
- All energy-related building systems in the project, which should include:
- Building envelope,
- HVAC systems,
- Lighting and daylighting systems,
- Pumps and motors, and
- Receptacle loads.
- Energy meters, and
- Scope of each energy meter.
- All energy-related building systems in the project, which should include:
- As-built specifications reflecting the following information:
- Quality and performance details for—
- All energy-related building systems in the project,
- Passive design strategies in the project,
- Active energy efficient strategies in the project,
- Renewable energy system, and
- Energy meters.
- Scope of each meter.
- Quality and performance details for—
- Policies and procedures for the proper use and maintenance of the energy-related building systems, including:
- The proper use and maintenance of the passive design strategies for the project owner and building manager; and
- The design and construction requirements for tenant fit-outs.
- Proof of the implementation of the policies and procedures, which should include:
- Communication records,
- Monitoring reports,
- Energy audit reports, and
- Photographs.
- Report on the effectivity of the implementation of policies and procedures, which must include:
- Evaluation whether the target energy consumption reduction was achieved;
- Evaluation of the effectivity of the passive design strategies, the energy efficiency strategies, and the renewable energy system;
- Challenges identified in the implementation of the strategies;
- Actions taken to prevent or resolve the issues; and
- Recommendations to further improve the energy performance of the project.
- Energy operations case report containing the following information:
- Annual energy consumption in kWh per energy end use,
- Annual total energy consumption in kWh, and
- Energy use intensity in kWh/m2.
Conserve
If the project team is continuing the implementation of energy conservation strategies, the project team should also submit the following:
- Report on the evaluation of the effectivity of the passive design and energy conservation strategies in the project. The evaluation should include:
- Evaluation of the effectivity of the passive design and energy conservation strategies;
- Challenges identified in the implementation of the strategies;
- Actions taken to prevent or resolve the issues; and
- Recommendations to further improve the passive design and energy conservation strategies of the project.
- Plans reflecting the passive design strategies in the project.
- Specifications reflecting the quality and performance details of each of the passive design strategies in the project.
- Purchase orders reflecting the specified passive design strategies in the project.
- Policies and procedures for the proper use and maintenance of the passive design strategies in the project.
- Proof of the implementation of the passive design and energy conservation strategies, which should include:
- As-built plans,
- As-built specifications,
- Communication records,
- Monitoring reports,
- Energy audit reports, and
- Photographs.
- Energy operations case report containing the computation for the actual reduction in the operational energy consumption attributed to the passive design and energy conservation strategies in the project. The reduction must be presented in the following:
- Annual reduction in operational energy consumption in kWh/m2, and
- Percentage of the reduction compared to the total annual operational energy consumption established in the energy base case.
Optimize
If the project team is using active energy efficiency strategies, the project team should submit the following:
- Report on the evaluation of the effectivity of the existing energy efficiency strategies in the project. The evaluation should include:
- Evaluation of the effectivity of the energy efficiency strategies;
- Challenges identified in the implementation of the strategies;
- Actions taken to prevent or resolve the issues; and
- Recommendations to further improve the energy efficiency strategies of the project.
- Plans reflecting the energy efficiency strategies in the project.
- Specifications reflecting the quality and performance details of each of the energy efficiency strategies in the project.
- Purchase orders reflecting the specified energy efficiency strategies in the project.
- Policies and procedures for the proper use and maintenance of the energy efficiency strategies in the project.
- Proof of the implementation of the energy efficiency strategies, which should include:
- As-built plans,
- As-built specifications,
- Communication records,
- Monitoring reports,
- Energy audit reports, and
- Photographs.
- Energy operations case report containing the computation for the actual reduction in the operational energy consumption attributed to the energy efficient strategies in the project. The reduction must be presented in the following:
- Annual reduction in operational energy consumption in kWh/m2, and
- Percentage of the reduction compared to the total annual operational energy consumption established in the energy base case.
Renew
Addenda
26 September 2022, v1.1.0 For 1. Report on the evaluation of the effectivity of the existing renewable energy strategies, changed:
existing energy efficiency strategies
toexisting renewable energy strategies
,effectivity of the energy efficiency strategies
toexisting use of renewable energy in the project
, andimprove the energy efficiency strategies of the project
toimprove the use of renewable energy in the project
.
If the project is using renewable energy, the project team should submit the following:
- Report on the evaluation of the effectivity of the existing renewable energy strategies in the project. The evaluation should include:
- Evaluation of the existing use of renewable energy in the project;
- Challenges identified in the implementation of the strategies;
- Actions taken to prevent or resolve the issues; and
- Recommendations to further improve the use of renewable energy in the project.
- Commissioning report reflecting the renewable energy systems were successfully maintained, tested and evaluated.
- Energy operations case report containing the computation for the actual annual renewable energy production in the project. The renewable energy use must be presented in the following:
- Equivalent energy intensity in kWh/m2 for the renewable energy used, and
- Percentage of the equivalent energy intensity for the renewable energy generated compared to the total annual operational energy consumption established in the energy base case.
If the project is using on-site renewable energy, the project team should also submit:
- As-built plans reflecting the location of the renewable energy system specified for the project.
- As-built specifications reflecting the renewable energy system specified in the project, including the following information:
- Type of renewable energy system,
- Quality requirements for the renewable energy system, and
- Performance requirement including the potential energy generation.
- Proof of the procurement of the renewable energy system, which should include:
- Purchase order reflecting the purchase of the specified renewable energy system, or
- Service contract reflecting the procurement of on-site renewable energy services from third-party service providers. If the on-site renewable energy system is leased by the project owner, the service contract must reflect the:
- Specifications of the selected renewable energy system compliant with the performance requirements for the project, and
- Duration of the lease or use of the system for at least three (3) years from the start of the performance period of the project.
- Policies and procedures for the proper use and maintenance of the renewable energy system in the project.
- Proof of the implementation of the on-site renewable energy system and the policies and procedures, which should include:
- Communication records,
- Monitoring reports,
- Energy audit reports, and
- Photographs.
If the project is using off-site renewable energy, the project team should also submit the approved supply contract with a registered retail electricity supplier reflecting the following:
- The duration of the supply must be for at least three (3) years from the start of the project's performance period; and
- The renewable energy supply must be equivalent to 100% of the potential annual operational energy consumption established in the energy base case.
Energy base case
Simulate the energy base case
When simulating the energy base case, the project team must submit:
- A copy of the standard used for the energy simulation for the project.
- A report on the scope and narrative description of the building used in the simulation, including the following:
- Total gross floor area in m2,
- Occupancy profile, including:
- Potential total number of users, and
- Occupancy patterns, including:
- Maximum number of users per 8-hour shift, and
- Number of 8-hour shifts for the project;
- Building use,
- All energy-related building systems in the project,
- Simulation program and its version used, and
- Summary of the energy modeling input data.
- A report for the simulated energy base case of the project, including the following:
- Annual operational energy consumption in kWh per energy end use,
- Annual total operational energy consumption in kWh, and
- Energy use intensity in kWh/m2.
Calculate the energy base case
When calculating the energy base case, the calculation for the energy performance must be reflective of the potential energy use patterns during the operations of the project. The project team must establish the narrative how the project and its energy-related building systems will be used to simulate the potential energy use in the project.
The project team must submit:
- A report on the scope and narrative description of the building used for the calculation, including:
- Total gross floor area in m2,
- Occupancy profile, including:
- Potential total number of users, and
- Occupancy patterns, including:
- Maximum number of users per 8-hour shift, and
- Number of 8-hour shifts for the project;
- Building use, and
- All energy-related building systems in the project.
- Copy of the reference code or generally-accepted standards used for the energy consumption rates.
- A report presenting the outcomes of the calculations, including the following:
- Analysis on the outcomes of the calculations and how the project team selected the design option,
- Annual energy consumption in kWh per energy end use,
- Annual total energy consumption of the project in kWh, and
- Energy use intensity in kWh/m2.
Present the annual energy consumption
To present the annual energy consumption as a base case, the project team must:
- Present the energy consumption of the project for at least twelve (12) months prior to the performance period, which should be based on:
- Utility bills, or
- Energy metering reports.
- A report on the scope and narrative description of the building used for the calculation, including:
- Total gross floor area in m2,
- Occupancy profile, including:
- Potential total number of users, and
- Occupancy patterns, including:
- Maximum number of users per 8-hour shift, and
- Number of 8-hour shifts for the project;
- Building use, and
- All energy-related building systems in the project.
- Present the energy consumption in the following:
- Annual energy consumption in kWh per energy end use;
- Annual total energy consumption of the project in kWh; and
- Energy use intensity in kWh/m2.
Changes to this document
v1.1.0, 26 September 2022
Section | Change | Type |
---|---|---|
How can you get you project certified? | Added information on the use of active rating schemes. | Substantial |
Requirements | Added the general requirements for the rating scheme, including the requirement to Reduce the overall energy demand of the project by 40% through Conserve and Optimize strategies. |
Substantial |
Requirements, Stage 1 — Design |
|
Substantial |
Requirements, Stage 1 — Design, Conserve |
|
Substantial |
Requirements, Stage 1 — Design, Optimize |
|
Substantial |
Requirements, Stage 1 — Design, Renew |
|
Substantial |
Requirements, Stage 2 — Construction |
|
Substantial |
Requirements, Stage 2 — Construction, Conserve |
|
Substantial |
Requirements, Stage 2 — Construction, Optimize |
|
Substantial |
Requirements, Stage 2 — Construction, Renew |
|
Substantial |
Requirements, Stage 3 — Operations | Changed "Establish an energy base case. The base case must include the review the implementation of all energy-related building systems..." to: Establish an energy base case using:
|
Substantial |
Requirements, Stage 3 — Operations, Conserve | Changed 4. Present the actual reduction in the operational energy consumption in kWh/m<sup>2</sup> based on the implemented energy conservation strategies. to:
|
Substantial |
Requirements, Stage 3 — Operations, Optimize |
|
Substantial |
Requirements, Stage 3 — Operations, Renew |
|
Substantial |
Rating |
|
Substantial |
Occupancy Type | Added descriptions for the different occupancy types. | Non-substantial |
Advancing Net Zero Energy | Changed "Advancing Net Zero Energy Rating Scheme" to "Advancing Net Zero Energy rating scheme". | Non-substantial |
Requirements, Stage 1 — Design | Added a list of energy end uses. | Non-substantial |
Compliance Notes, Stage 1 — Design | For 5. Specifications, changed Quality and performance details for— to Quality and performance details for the following: |
Non-substantial |
Compliance Notes, Stage 1 — Design | For 6. Energy design case report, removed Analysis how the project team selected the final design option for the project, , and added:
|
Non-substantial |
Compliance Notes, Stage 1 — Design | Changed Policy document to Documented policy |
Non-substantial |
Compliance Notes, Stage 1 — Design, Conserve | For 6. Energy design case report, changed potential reduction to projected reduction , and changed:
|
Non-substantial |
Compliance Notes, Stage 1 — Design, Optimize | For 6. Energy design case report, changed potential reduction to projected reduction , and changed:
to:
|
Non-substantial |
Compliance Notes, Stage 1 — Design, Renew | For 6. Energy design case report, changed potential energy production to projected energy production , and changed:
to:
|
Non-substantial |
Compliance Notes, Stage 3 — Operations, Renew | For 1. Report on the evaluation of the effectivity of the existing renewable energy strategies, changed existing energy efficiency strategies to existing renewable energy strategies , effectivity of the energy efficiency strategies to existing use of renewable energy in the project , and improve the energy efficiency strategies of the project to improve the use of renewable energy in the project . |
Non-substantial |
Acknowledgements
The PHILGBC acknowledges the contributions of the following organizations and individuals in the development of the Advancing Net Zero Energy Rating Scheme and its User Guide.
- Pilot project proponents
- Arthaland Corporation
- Cebu Landmasters
- Neo Property Management, Inc.
- Laguna Lake Development Authority
- Technical contributors
- Rowena C. Ramos, Ecotektonika, Inc.
- June Ann Villaverde, Ecotektonika, Inc.
- Kristina Samantha Pobre, Arthaland Corporation
- Christopher de la Cruz, Chief Executive Officer, PHILGBC
- PHILGBC National Secretariat
- Ma. Anna G. Tungol, Executive Director
- Mario Lawrence C. Suelto, Program Manager, ANZ/PH Program
- Rowena G. Elayda
- Maria Loudeleen L. Garcia-Patolot
- John Reniel S. Englis